Overview:
Tecnicas Reunidas, S.A. is a leading international general contractor engaged in the engineering and construction of industrial facilities in the fields of:
- Oil & Gas
- Refining & Petrochemical
- Power Generation
- Infrastructures and industries
- Energy Transition
Key Responsibilities:
- Verify if all the approved milestone and network changes have been incorporated into the Level 3 schedule;
- Produce Level 3 Schedule according to the Contractual Milestone/ Key dates;
- Prepare and update the Level 3 Schedule to Planning Manager. Receiving Subcontractor‟s submitted L4 (Progress Steps), He/She will integrate Level 4 schedules into Level 3, in order to be integrated in Progress Control System (PCS);
- Set up and check major engineering and material derivable susceptible to cause impact in Level 3 Schedule;
- Based on the above explained, He/She will develop a report with PCS including, at least, the following:
1) Preparation of Work-Front;
2) Critical path identification;
3) Necessary resource identification;
4) Necessary activities to achieve completion.
- To develop charts and possible trends for the Project;
- Identification and monitoring each work package (from L3);
- Together with construction area managers, He/She will analyze the Work-Front (L3) schedule in order to provide the remedial actions required;
- Will study any deviation, as per achieved progress, and issue a report showing the activities on advance or delayed referred to the schedule;
- Will submit all issued reports to the Planning Manager.
Requirements:
- Proficiency in scheduling tool Primavera P6;
- Extensive proven experience as Planning Engineer in Oil &G as Projects;